Engineering Achievements | Every Result Stands as Proof of Professionalism and Trust
From large-scale infrastructure and process plants to energy and environmental engineering, Peiloong builds a record of dependable results through steady site management, precise construction quality, and cross-team collaboration. Every project is more than a completion record; it is our commitment to quality and safety.
Coal Mill & Cement MillRotary KilnIncinerator & Air Quality Control SystemPaper Factory DuctClinker CoolerSteel Structure Manufacture and ErectionPiping Works
Project Case Studies
01
Coal Mill & Cement Mill
01
Installation Project of Raw Mill No.1 at Hsing Hsing Chiayi Cement Plant
02
Installation Project of Coal Mill No.7 at TCC Zhudong Cement Plant
03
Suao Plant – Coal Mill No.6
04
Bali Site – Cement Mills No.1 to No.4
05
Cement Mills No.1 & No.2 Installation Project at Taiwan Cement Corporation (TCC) Hualien Plant
06
Cement Mills No.1 & No.2 Installation Project at Taiwan Cement Corporation (TCC) Kaohsiung Plant
07
Cement Mills No.1–4 Installation Project at Taiwan Cement Corporation (TCC) Changbin Plant
02
Rotary Kiln
01
No.6 Rotary Kiln Fabrication Works (5000 Metric Tons per Day Capacity) – TCC Suao Plant
02
Rotary Kiln No.2 Installation Works (2000 Metric Tons per Day Capacity) – Hsingda Cement Plant, Suao
03
Rotary Kiln No.3 Installation Works (2500 Metric Tons per Day Capacity) – Hsingda Cement Plant, Suao
04
Rotary Kiln No.4 Installation Works (3000 Metric Tons per Day Capacity) – Chia Hsin Cement Plant, Gangshan
05
Rotary Kiln No.6 Installation Works (5000 Metric Tons per Day Capacity) – TCC Suao Plant
06
Rotary Kilns No.1 and No.2 Installation Works (8600 Metric Tons per Day Capacity) – TCC Heping Plant
03
Incinerator & Air Quality Control System
01
Air Quality Control System (AQCS) Fabrication Works – Pingtung Kanding Incineration Plant Scope: FGD, Fabric Filter (FF), Stack, Spray Dryer Absorber, and Air Dust Handling System
02
Air Quality Control System (AQCS) Fabrication Works – Tainan Yongkang Incineration Plant Scope: Flue Gas Desulfurization (FGD), Fabric Filter (FF), Stack, Spray Dryer Absorber, and Air Dust Handling System
03
Electrostatic Precipitator (EP) Fabrication and Installation Works for Raw Material and Clinker System No.3 – Jiantai Cement Plant, Kaohsiung
04
Electrostatic Precipitator (EP) Discharge Electrode Renewal Works – Taichung Power Plant
05
PRS Bag Filter Installation Works for Units No.1 and No.2 – Taipower Linkou Power Plant
06
PRS Bag Filter Installation Works for Unit No.3 – Taipower Linkou Power Plant
Show / hide 11 more
07
GGH Flue Gas Desulfurization (FGD) System and Piping Installation Works for Unit No.3 – Taipower Linkou Power Plant
08
Boiler Gas Duct (GB11) and Selective Catalytic Reduction (SCR) Package Installation Works for Unit No.3 – Taipower Linkou Power Plant
09
Flue Gas Desulfurization (FGD) System Fabrication Works – Kaohsiung Central Incineration Plant
10
Fiberglass Reinforced Plastic (FRP) Fabrication and Installation Works – Chiayi Fulong Incineration Plant
11
Electrostatic Precipitators (EP) No.5–7 Installation Works – Chung Hwa Pulp Plant, Hualien
12
Boiler No.2 Electrostatic Precipitator (EP) Fabrication and Installation Works – Taiwan Sugar Corporation (Taisugar), Pingtung
13
Electrostatic Precipitator (EP) Fabrication and Installation Works – Formosa Cogeneration Plant, Douliu, Chiayi
14
Electrostatic Precipitators (EP) No.407 & 408 Fabrication and Installation Works – CPC Corporation, Kaohsiung
15
Electrostatic Precipitator (EP) Fabrication and Installation Works – Cheng Loong Cogeneration Plant, Houli Mill
16
Electrostatic Precipitator (EP) Fabrication and Installation Works for G7 Cogeneration Plant – Taiwan Chemical Corporation, Changhua
17
Electrostatic Precipitator (EP) Fabrication and Installation Works – Formosa Heavy Industries at IKPP Jakarta Plant, Indonesia
04
Paper Factory Duct
Paper Mill
01
Air Duct and Paper Machine Hood Fabrication and Installation Works – Xinying Paper Mill, Tainan
02
Air Duct and Paper Machine Hood Installation Works – YFY Xinwu Paper Mill, Taoyuan
03
Paper Machine Air Duct and Hood Installation Works – Cheng Loong Houli Mill, Taichung
05
Clinker Cooler
01
Clinker Cooler No.6 Installation Works – Taiwan Cement Corporation (TCC) Suao Plant
02
Clinker Cooler Fabrication and Installation Works – Taiwan Cement Corporation (TCC), San Geng Plant, Hualien
03
Clinker Cooler Fabrication Works for Kilns No.1 and No.2 – Taiwan Cement Corporation (TCC) Heping Plant, Hualien
04
Air Heat Exchanger Equipment Installation Works – Xingyuan Power Plant
05
Air-Cooled Condenser (ACC) Equipment Installation Works – Xingyuan Power Plant
06
Steel Structure Manufacture and Erection
Power Plant
01
Steel Structure Fabrication and Installation Works – Chia-Hui Power Plant, Chiayi
02
Steel Structure Installation Project at Hsingda Power Plant, Kaohsiung
07
Piping Works
01
Pipeline Above-Ground Conversion Works – CPC Corporation, Taichung
02
Gas Piping Installation Works – Micron, Tainan
03
Gas Piping Installation Works – Micron, Tongluo
04
Chilled Water Piping Installation Works – Micron, Tainan