Project Case Studies
Engineering Achievements | Every Result Stands as Proof of Professionalism and Trust
From large-scale infrastructure and process plants to energy and environmental engineering, Peiloong builds a record of dependable results through steady site management, precise construction quality, and cross-team collaboration. Every project is more than a completion record; it is our commitment to quality and safety.
Milestones
1990-1995
- Founded Peiloong Mechanical Engineering Co., Ltd.
- BOF No.1 Furnace Secondary Baghouse Dust Collector – China Steel Corporation | Fabrication and Installation
1996-2000
- Cooler, Rotary Kiln, and Waste Heat Recovery System – TCC Group Holdings, Hualien Plant Line 3 | Fabrication, Installation, and Commissioning
- Coolers for Kilns No.1 and No.2 – TCC Group Holdings, Heping Plant | Fabrication
- Flue, Dust Collection Equipment, and Platforms – Kanting Resource Recovery (Incineration) Plant, Pingtung | Fabrication and Installation
- Rotary Kiln System – TCC Group Holdings, Heping Plant | Fabrication
- Cooler Systems for Kilns No.1 and No.2 – TCC Group Holdings, Heping Plant | Fabrication and Installation
2001-2005
- Flue Gas Treatment System – Yongkang Resource Recovery (Incineration) Plant, Tainan | Fabrication and Installation
- 1050kW Cement Mill (Mill, Dryer, and Piping System) – ADVANCED-TEK SYSTEMS, Hualien Plant | Installation
- 1050kW Cement Grinding Mill – ADVANCED-TEK SYSTEMS, Bali Plant | Installation
- Emergency Shutdown Repair (Kiln and Cement Mill Systems) – Global Cement Corporation | Maintenance and Repair
2006-2010
- 1050kW Cement Mill – ADVANCED-TEK SYSTEMS, Kaohsiung & Changbin Plants | Installation (Including gearbox, separator, oil station, cement mill, dryer, and hot air furnace)
- 1050kW Cement Grinding Mill – ADVANCED-TEK SYSTEMS, Changbin Plant | Installation
- Electrostatic Precipitator Discharge Electrode Replacement – Taiwan Power Company, Taichung Power Plant | Replacement Works
- Car Washing System Improvement and Brush Equipment Repair – Taiwan High Speed Rail | Piping, pneumatic cylinder bearings, lubrication, motor maintenance, air system, and commissioning
- Cement Mill No.2 Liner Plate Replacement – Chuan Hsing Cement Corporation | Replacement
- 110m/c Guard Shields and Ducting System – Cheng Loong Corp., Houli Mill | Installation (Including METSO guards, steel panels, pulp ducts, wire section ducts, and air ducting systems)
2011-2015
- 50-Ton Furnace Slag Grinding System – Ji Cheng, Da Shu Unit No.1 | Installation
- Cement Mill No.3 (400kW × 200 × 600L Grinder) – ADVANCED-TEK SYSTEMS, Chuan Hsing Plant | Installation
- Baghouse Dust Collector – Taiwan Power Company, Linkou Thermal Power Plant Unit No.1 | Installation
- PM3 Dryer Hood and Supply/Exhaust Air System – YFY Inc., Xinwu Paper Mill | Installation
2016-2020
- Baghouse Dust Collector – Taiwan Power Company, Linkou Thermal Power Plant Unit No.3 | Installation
- Flue Gas Denitrification (DeNOx) System – Taiwan Power Company, Linkou Thermal Power Plant | Installation
- Flue Gas Desulfurization (FGD) System – Taiwan Power Company, Linkou Thermal Power Plant | Installation
- Boiler Unit No.2 Secondary Superheater Retrofit – Taiwan Power Company, Linkou Power Plant | Improvement Project
- Electrostatic Precipitator Replacement – China Petrochemical Development Corporation (CPDC), Toufen CHP Plant | Replacement Works
- ESP Retrofit Project – TCC Group Holdings, Heping Plant Unit No.1 (2019) | Retrofit
- Utility Area Equipment Demolition – The Chemours (Taiwan) Company Limited, Guanyin Plant | Dismantling Works
- Steel Piping Supports – Jia-Huei Power Plant Phase II Expansion | Fabrication, Painting, and Installation
- Utility Area Boiler, Motors, Piping & I&C Equipment – The Chemours (Taiwan) Company Limited, Guanyin Plant | Dismantling Works
2021-2025
- BOP Steel Structure – Jia-Huei Power Plant | Fabrication and Installation
- Shared Pipe Rack Piping – Taiwan Power Company, Datan Power Plant Units 8 & 9 | Installation
- Subcontracting Works – GE Taiwan, Datan Power Plant Units 8 & 9 | Project Execution
- Natural Gas Purification System – GE Taiwan, Datan Power Plant Unit 7 | Installation
- Equipment Dismantling, Pipe Rack Steel Structure Renewal & Equipment Installation – Chemours Taiwan, Guanyin Plant | Works Execution
- Substation Equipment Maintenance and Management – GE Taiwan for Taiwan Power Company, Northern Region | Maintenance
- Shared Pipe Rack Steel Structure – MGC Pure Chemicals Taiwan, Inc., Taichung Port Area | Installation
- BOP Steel Structure – Taiwan Power Company, Hsinta Power Plant Units 1–3 | Fabrication and Installation
- BOP Equipment – Taiwan Power Company, Hsinta Power Plant Units 1–3 | Installation
- New Plant Steel Structure – Heineken Taiwan, Pingtung Brewery | Fabrication and Installation
- Water Treatment Equipment (Piping & I&E) – Ovivo Taiwan Co., Ltd., Zhongjia Power Plant | Installation
- Steel Structure Fabrication & Installation, and Material Supply – SUEZ Group | Project Execution
2026
- Pipeline Above-Ground Conversion – CPC Corporation, Taichung | Works
- Gas Piping – Micron, Tainan | Installation
- Gas Piping – Micron, Tongluo | Installation
- Chilled Water Piping – Micron, Tainan | Installation
Project Case Studies
01
Coal Mill & Cement Mill
01
Installation Project of Raw Mill No.1 at Hsing Hsing Chiayi Cement Plant
02
Installation Project of Coal Mill No.7 at TCC Zhudong Cement Plant
03
Suao Plant – Coal Mill No.6
04
Bali Site – Cement Mills No.1 to No.4
05
Cement Mills No.1 & No.2 Installation Project at Taiwan Cement Corporation (TCC) Hualien Plant
06
Cement Mills No.1 & No.2 Installation Project at Taiwan Cement Corporation (TCC) Kaohsiung Plant
07
Cement Mills No.1–4 Installation Project at Taiwan Cement Corporation (TCC) Changbin Plant
02
Rotary Kiln
01
No.6 Rotary Kiln Fabrication Works (5000 Metric Tons per Day Capacity) – TCC Suao Plant
02
Rotary Kiln No.2 Installation Works (2000 Metric Tons per Day Capacity) – Hsingda Cement Plant, Suao
03
Rotary Kiln No.3 Installation Works (2500 Metric Tons per Day Capacity) – Hsingda Cement Plant, Suao
04
Rotary Kiln No.4 Installation Works (3000 Metric Tons per Day Capacity) – Chia Hsin Cement Plant, Gangshan
05
Rotary Kiln No.6 Installation Works (5000 Metric Tons per Day Capacity) – TCC Suao Plant
06
Rotary Kilns No.1 and No.2 Installation Works (8600 Metric Tons per Day Capacity) – TCC Heping Plant
03
Incinerator & Air Quality Control System
01
Air Quality Control System (AQCS) Fabrication Works – Pingtung Kanding Incineration Plant Scope: FGD, Fabric Filter (FF), Stack, Spray Dryer Absorber, and Air Dust Handling System
02
Air Quality Control System (AQCS) Fabrication Works – Tainan Yongkang Incineration Plant Scope: Flue Gas Desulfurization (FGD), Fabric Filter (FF), Stack, Spray Dryer Absorber, and Air Dust Handling System
03
Electrostatic Precipitator (EP) Fabrication and Installation Works for Raw Material and Clinker System No.3 – Jiantai Cement Plant, Kaohsiung
04
Electrostatic Precipitator (EP) Discharge Electrode Renewal Works – Taichung Power Plant
05
PRS Bag Filter Installation Works for Units No.1 and No.2 – Taipower Linkou Power Plant
06
PRS Bag Filter Installation Works for Unit No.3 – Taipower Linkou Power Plant
Show 11 moreShow less
07
GGH Flue Gas Desulfurization (FGD) System and Piping Installation Works for Unit No.3 – Taipower Linkou Power Plant
08
Boiler Gas Duct (GB11) and Selective Catalytic Reduction (SCR) Package Installation Works for Unit No.3 – Taipower Linkou Power Plant
09
Flue Gas Desulfurization (FGD) System Fabrication Works – Kaohsiung Central Incineration Plant
10
Fiberglass Reinforced Plastic (FRP) Fabrication and Installation Works – Chiayi Fulong Incineration Plant
11
Electrostatic Precipitators (EP) No.5–7 Installation Works – Chung Hwa Pulp Plant, Hualien
12
Boiler No.2 Electrostatic Precipitator (EP) Fabrication and Installation Works – Taiwan Sugar Corporation (Taisugar), Pingtung
13
Electrostatic Precipitator (EP) Fabrication and Installation Works – Formosa Cogeneration Plant, Douliu, Chiayi
14
Electrostatic Precipitators (EP) No.407 & 408 Fabrication and Installation Works – CPC Corporation, Kaohsiung
15
Electrostatic Precipitator (EP) Fabrication and Installation Works – Cheng Loong Cogeneration Plant, Houli Mill
16
Electrostatic Precipitator (EP) Fabrication and Installation Works for G7 Cogeneration Plant – Taiwan Chemical Corporation, Changhua
17
Electrostatic Precipitator (EP) Fabrication and Installation Works – Formosa Heavy Industries at IKPP Jakarta Plant, Indonesia
04
Paper Factory Duct
Paper Mill
01
Air Duct and Paper Machine Hood Fabrication and Installation Works – Xinying Paper Mill, Tainan
02
Air Duct and Paper Machine Hood Installation Works – YFY Xinwu Paper Mill, Taoyuan
03
Paper Machine Air Duct and Hood Installation Works – Cheng Loong Houli Mill, Taichung
05
Clinker Cooler
01
Clinker Cooler No.6 Installation Works – Taiwan Cement Corporation (TCC) Suao Plant
02
Clinker Cooler Fabrication and Installation Works – Taiwan Cement Corporation (TCC), San Geng Plant, Hualien
03
Clinker Cooler Fabrication Works for Kilns No.1 and No.2 – Taiwan Cement Corporation (TCC) Heping Plant, Hualien
04
Air Heat Exchanger Equipment Installation Works – Xingyuan Power Plant
05
Air-Cooled Condenser (ACC) Equipment Installation Works – Xingyuan Power Plant
06
Steel Structure Manufacture and Erection
Power Plant
01
Steel Structure Fabrication and Installation Works – Chia-Hui Power Plant, Chiayi
02
Steel Structure Installation Project at Hsingda Power Plant, Kaohsiung
07
Piping Works
01
Pipeline Above-Ground Conversion Works – CPC Corporation, Taichung
02
Gas Piping Installation Works – Micron, Tainan
03
Gas Piping Installation Works – Micron, Tongluo
04
Chilled Water Piping Installation Works – Micron, Tainan